• Posted 15/07/2026 3:47pm

Future Plans 2026

XDC2.NZ Boulevard Retirement Village Aerial Drone Shot 1

 

2026 and Onwards 

We have commenced our final stage of 28 villas, marking the next evolution of The Boulevard Lifestyle Village in Rolleston.

This stage includes a mix of spacious villa options, including three-bedroom double garage homes, two-bedroom double garage villas with ensuite and bathroom, and two-bedroom single garage designs with ensuite and separate toilet layouts.

The first villas in this stage are expected to be ready for occupancy in December 2026.

Due to strong demand, only a limited number of the earliest villas remain available.

This stage will also introduce the new village lodge, featuring a café, swim spa, gym, library, darts area, and pool table—forming the social heart of the community.

 

Download Full Concept Site Plan

05 Apr

New Townhouses

COVID and supply issues have hampered the build - as they have in the wider community - but with Christmas a distant memory, and Easter just around the corner, we...

10 May

New Villas Occupied

With residents moving into their new homes at the end of March. This brings the total of villas completed and occupied to 38.

Latest Posts

  • Future Plans 2026

    15 Wednesday, 2026

    Check these out now!

    We have commenced our final stage of 28 villas, marking the next evolution of The Boulevard Lifestyle Village in Rolleston.

    The first villas in this stage are expected to be ready for occupancy in December 2026.

  • Two bedroom villa, single garage now available.

    23 Wednesday, 2025
    We do have one more refurbished villa that will be available shortly. Please enquire now as they do not often become available.
  • Final villa builds in this stage of development.

    23 Wednesday, 2025
    ORA sales have been great since we advertised that these were going ahead, with only a few two-bedroom, two-bathroom double garage villas still available.
  • New Villas Occupied

    10 Tuesday, 2022
    With residents moving into their new homes at the end of March. This brings the total of villas completed and occupied to 38.